Are you preparing for your API-580 Risk Based Inspection Exam? Passcert new updated Risk Based Inspection API-580 Dumps to help you best prepare for your coming API-580 Certification Exam, you will feel confident to write your test. With the help of the Passcert study material and guidance of API-580 Risk Based Inspection exam, you can pass your API-580 exam in your first attempt.
API-580 Exam Overview - Risk Based Inspection
API welcomes highly specialized inspectors, engineers, other professionals across the entire petrochemical industry to obtain the API-580 Risk Based Inspection certification as a validation of their profound knowledge of Risked Based Inspection (RBI).
RBI has quickly become one of the industry's premiere instruments and preferred methods of inspection. The API-580 certification will add significant value to your professional credentials, demonstrating to your employers and clients that you have obtained a high level of proficiency and understanding in this very important field.
The API-580 Risk Based Inspection certification exam tests the individual's knowledge and expertise in the field of Risk Based Inspection. API-580 contains definitions and concepts. It discusses detailed description of minimum program requirements to qualify for establishing inspectionintervals based on Risk-Based Inspection (RBI) analysis.
API-580 Risk-Based Inspection Exam Details
Questions: 70 multiple-choice questions
Duration: 3.25 hours.
Passing score: 70% or 49 correct answers.
API Member Fee: $300
Non-Member Fee: $350
Are you qualified to take the API 580 exam?
Prior to submitting an application, please use the table below to determine if you qualify to take the API 580 exam:
Share API-580 Free Demo From Passcert Risk-Based Inspection API-580 Dumps
1.The data validation step stresses the need for a knowledgeable individual.
A. To comparing data from the inspections to the expected deterioration mechanism and rates
B. To compare the results with previous measurements on that system
C. Similar systems at the site or within the company or published data
D. All of the above
Answer: D
2.Following are the critical variables for deterioration mechanism except
A. Material of construction
B. Process operating
C. Start up and shut down conditions
D. Insulation
Answer: D
3.If a qra has been prepared for a process unit, the analysis can borrow extensively from this effort.
A. Rbi consequence
B. Rbi likelihood
C. Rbi probability
Answer: C
4.If the probability and consequence combination (risk) is high enough to be unacceptable, then
A. A mitigation action to predict or prevent the eventis recommended.
B. A mitigation action to predict or prevent the event isnot recommended
C. Warrant to analyze risks involved
Answer: A
5.A Rbi analysis shares many of the techniques and data requirements with a____________.
A. Qra
B. Pha
C. Hazop
D. Event tree
Answer: A
6.If multiple inspections have been performed, which inspection may best reflect current operating conditions?
A. Most recent inspection
B. Base line inspection survey
C. Process conditions
D. Corrosion survey
Answer: A
- Related Suggestion
- Pressure Vessel Inspector API-510 Dumps July 01,2024
- Piping Inspector API-570 Exam Dumps December 07,2022
- API-936 Refractory Personnel Certification Exam Dumps November 17,2022